Equisales has acquired GPS’s T&D Division June 4, 2010



Click the gavel for new auction items!
  Contact  

For your consideration . . . Immediately Available

SURPLUS NEW
126/168/210 MVA

Hyundai Qty (2), 3-phase
525 kV Wye - 16 kV Delta


SURPLUS NEW
156/208/260 MVA

Hyundai Qty (1), 3-phase
525 kV Wye - 16 kV Delta

  Guaranteed Values Measured Values/Results
Impedance at 85° C
Unit 1 & 2: 126 MVA (OA) 9.50% 9.225% & 9.172%
Unit 3: 156 MVA (OA) 9.00% 9.420%



Voltage Regulation

Unit 1 & 2: 210 MVA (FA2) 1.70% 1.468% & 1.449%
Unit 3: 260 MVA (FA2) 1.53% 1.503%



No Load Losses

Unit 1 & 2: 126 MVA (OA) 143.00 kW 142.623 kW & 139.869 kW
Unit 3: 156 MVA (OA) 165.00 kW 145.770 kW



Load Losses at
85° C
Unit 1 & 2: 126 MVA (OA) 236.34 kW 216.327 kW & 212.850 kW
Unit 3: 156 MVA (OA) 264.24 kW 253.430 kW




Additional Generator Step-Up Transformers

HV LV Rating Mfg.
67.5 kV Wye 16 kV Delta 163 MVA McGraw Edison
69 kV Wye 20 kV Delta 220/252 MVA McGraw Edison
115 kV Wye 13.8 kV Delta 36 MVA RTE, Rewound
115 kV Wye 13.8 kV Delta 36/48/60 MVA GE Prolec, SURPLUS NEW
115 kV Wye 17.1 kV Delta 210 MVA Westinghouse
126 kV Wye 17.3 kV Delta 180 MVA GE Rewind, SURPLUS NEW
138 kV Wye 15.6 kV Delta 140/186/232 MVA Waukesha, SURPLUS NEW
145 kV Wye 13.8 kV Delta 48 MVA Unido, Qty 2
230 kV Wye 20 kV x 20 kV Delta 400 MVA GE
230 kV Wye 13.8 kV x 13.8 kV Delta 101/135/169 MVA ABB
345 kV Wye 13.2 kV x 13.2 kV Delta 76/101/127 MVA Waukesha, SURPLUS NEW
345 kV Wye 19 kV Delta 670 MVA ABB, SURPLUS NEW
345 kV Wye 20 kV Delta 193/216 MVA single phase Westinghouse, Qty 3 + 1 spare
500 kV Wye 22 kV Delta 369 MVA single phase GE, qty 3

Call for Taps & LTC info • 3-phase and 60hz unless noted • Units are Subject to Prior Sale
Note: This is a partial list of our units - please call with your desired voltages & rating

About us . . . We are a fast-track provider of oil-filled transformers, both surplus-new units from cancelled projects, and used transformers that are replaced through upgrades or changing system conditions. Warranties available.

We also specialize in rewound transformers, up to 80 MVA @ 230 kV, with new windings, new insulation, new controls, etc. We can deliver substation transformers in 24 - 30 weeks at a significant cost savings. Our Engineering Department utilizes 5 different rewind facilities, depending on size, voltage and customer preference.

Do you have transformers for sale? We are interested to know about any transformers you have taken out of service, or extra spares you may have, because we frequently purchase units for our rewind business and for requirements.